The Altair Community is migrating to a new platform to provide a better experience for you. In preparation for the migration, the Altair Community is on read-only mode from October 28 - November 6, 2024. Technical support via cases will continue to work as is. For any urgent requests from Students/Faculty members, please submit the form linked here

Neural Net Topology and Prediction in RM Studio 7.4

cakmancakman Member Posts: 6 Contributor I
edited November 2018 in Help

Good day,

 

I upgraded Rapid Miner Studio 7.3 version to 7.4, now I cannot retrieve the topology of the Neural Net in the results section.

Can you pls help how can I retrieve the topology of the network in 7.4?

 

Also is it possible to see predicted reuslts after applying the model?

In the results section I can only see Performance results as well as the weights.

 

Thank you.

Ceren

 

Best Answer

  • Thomas_OttThomas_Ott RapidMiner Certified Analyst, RapidMiner Certified Expert, Member Posts: 1,761 Unicorn
    Solution Accepted

    That process is one I created from Bala Depreshande's book, Chapter 10 I think. Looping operator's are fantastic and in that process it takes the last date and then generates new dates with the predictions. So if  the horizon is 5, it would take generate 5 new predictions for the next 5 days. It's pretty cool but heavily reliant on order of execution of the operators. 

Answers

  • MariusHelfMariusHelf RapidMiner Certified Expert, Member Posts: 1,869 Unicorn

    Hi cakman, 

     

    I assume you are using the Cross Validation operator.

     

    To see the model (the Neural Net), you need to connect the "mod" output of the Cross Validation to the process output.

     

    To see the predictions, the "tes" output must be connected.

     

    Regards,

    Marius

  • cakmancakman Member Posts: 6 Contributor I

    Hi Marius,

     

    Thank you for yr kind reply.

    I used Split validation, anyhow tried the steps you mentioned, but now faced another problem in my data set (from repository). 

    The system detected a problem and the error message read as "this may not be portable when sharing process"

    I really don't understand, I made every steps successfully in Rapid Miner 7.3 without any error messages.

    Now in Rapid Miner 7.4 many error messages that I cannot clear. See most of the features have been changed.

    I really don't know how to fix the error message

     

     

    Have a nice day.

    Ceren

     

     

  • Thomas_OttThomas_Ott RapidMiner Certified Analyst, RapidMiner Certified Expert, Member Posts: 1,761 Unicorn

    That error relates to how you set up your process and data repository. It's just giving a warning to say that if you were to share this process and data, it's not in a relative path type of format and may break on some other users PC. Nothing to worry about unless you are collaborating with others. 

  • cakmancakman Member Posts: 6 Contributor I

    Dear Thomas,

     

    Many thanks for yr kind reply.

    I fixed the problem however now facing with another difficutly.

     

    I have 62 months data set and tried to prdict 63th month.

    I run all the processes from yr videos successfully but cannot see any 63th month data.

    I know I'm missing a point, but could not find it. I need to show it on my PhD thesis.

    I'd be glad if you'd assist.

     

    Thanks you for yr kind concern.

     

    Have a nice day.

     

    BRgds,

    Ceren

  • Thomas_OttThomas_Ott RapidMiner Certified Analyst, RapidMiner Certified Expert, Member Posts: 1,761 Unicorn

    Ok, is this a time series problem? If yes, are you using the Sliding Window Validation operator?

     

    Take a look at the sample process I posted here: http://community.rapidminer.com/t5/RapidMiner-Studio-Forum/Recall-Error/m-p/37302#U37302

     

    That will do point forecasting on a time series. I used an SVM but you can swap it out for a ANN.

  • cakmancakman Member Posts: 6 Contributor I

    Dear Thomas,

     

    Yes this is a forecasting problem, and I used sliding window validation and forecasting performance.

    I utilized many of your videos, appreciate them; very helpful.

    I tried to divide the data set manually as training and test then did the processes for forecasting.

     Here attached you can find the process I run.

     

    I checked the link that you sent, but I haven't tried a loop operator before.

    Is there any saved repository for the link you have sent or any video that I can watch to have an idea?

     

     

    Brgds,

    Ceren

  • cakmancakman Member Posts: 6 Contributor I

    Dear Thomas,

     

    Thank you so much for the refences.

     

    Have a nice day.

    Ceren

Sign In or Register to comment.